Thursday, 20 November 2008
   
  Front Page arrow News arrow Front Page arrow Safety Harbor's Main Street Renovations Begin In April
Site Design by MySafetyHarbor.com
 
Safety Harbor Home FOR RENT 2BR 1 BA, Large shaded fenced backyard, close to parks & schools. 336 Fourth Ave. N., Safety Harbor, $900/mon. + security. Call 727-515-8562.
Advertisement

Safety Harbor's Main Street Renovations Begin In April E-mail
Sunday, 01 April 2007

Safety Harbor's Engineering Department has notified downtown businesses that renovations of Main Street will begin in April.

Six downtown intersections will be resurfaced with decorative brick pavers and four of those — at Second, Fourth, Sixth and Eighth avenues — also will be reconstructed with raised platforms that are traffic calming devices designed to regulate speed.

The city has considered various measures to reduce speed along Main Street, including installing additional stop signs. Late last year the commission decided to install the so-called "speed tables," which are not as obtrusive as speed bumps or the rubberized speed "humps" that have been installed on a number of local residential streets.

The project is scheduled to begin with remilling of the intersections, which will involve grinding asphalt to a depth of four inches. Brick contractors will rebuild each of the intersections and then the entire street will be resealed. All pavement markings will be replaced with thermoplastic material, including edging markings intended to more clearly define traffic lanes on the street.

The work will require periodic detours in the downtown area

In addition to the street work, the city will be renovating the Mullet Creek Bridge on Philippe Parkway at the north entry to downtown. Steel guardrails are being removed and will be replaced with a series of vertical bollards. The bridge is being repainted and new lighting is to be installed.

Sidewalk also is to be installed from Jefferson Street to Church Street on the east side of the road, marking the first time continuous sidewalk has been in place along both sides of the parkway from downtown to just south of S.R. 580.

Work is to be complete by May.

 
< Prev   Next >
_________________________ Pets Best Friend of Tampa Bay, Inc. In-Home Pet Sitting Ken & Darla Klein Insured/Bonded 727-725-1996 _________________________


Get The Best Free Joomla Templates at www.joomla-templates.com
Copyright © 2008.  All rights are retained by Tropical Breeze Publications, Inc., TropicalBreeze.com, or their assignees. Unauthorized duplication of photos and/or articles by any means, mechanical or electronic, is strictly prohibited. Photos purchased from our gallery are licensed for personal use only and may not exhibited, performed, or modified in any fashion.
Tropical Breeze is published by Tropical Breeze Publications, Inc.  Editorial and Corporate Headquarters: 630 2nd St. S., Safety Harbor, FL 34695.  Editor & Publisher: Floyd E. Egner, III.  Typesetting & Graphics: Sue Suby, Synergy Associates.  Website Design: Dan Gerson.
Login